Recycled Aggregate Coverage

Recycled Material Coverage

The coverage calculator and the coverage chart below assists contractors in determining approximate quantities required per project specifications.

The totals calculated in our estimating tools are for general estimates only. Each project is distinctive in overall site conditions and in concurrence with varying general outside factors and variations that may impact the overall outcome of each project. It is the responsibility of the contractor to make their own determinations in their final projections.

Crushed Aggregate Coverage Calculator

Enter coverage area and depth specifications for approximate ton requirements.

Next Step: Map from my Project to Henderson Pit →

Recycled Concrete Road Base Coverage Table

Locate the project area square footage in the left black column and depth of coverage requirements in the top black row. Span right from coverage area and down from coverage depth to determine approximate tons required.

Depth of Coverage
1″ 2″ 3″ 4″ 5″ 6″ 7″ 8″ 9″ 10″ 11″ 12″
1000 SF 4 8 13 17 21 25 29 33 38 42 46 50
2000 SF 8 17 25 33 42 50 58 67 75 83 92 100
3000 SF 13 25 38 50 63 75 88 100 113 125 138 150
4000 SF 17 33 50 67 83 100 117 133 150 167 183 200
5000 SF 21 42 63 83 104 125 146 167 188 208 229 250
6000 SF 25 50 75 100 125 150 175 200 225 250 275 300
7000 SF 30 59 88 117 146 175 204 233 263 292 321 350
8000 SF 33 67 100 133 167 200 233 267 300 333 367 400
9000 SF 38 75 113 150 188 225 263 300 338 375 413 450
10000 SF 42 83 125 167 208 250 292 333 375 417 458 500